An error occured. Details Hide
You have unsaved pages. Restore Cancel

Uganda - Total Electricity Installed Capacity

497,420 (Kilowatt) in 2006

The maximum rated output of a generator, prime mover, or other electric power production equipment under specific conditions designated by the manufacturer. Installed generator nameplate capacity is commonly expressed in megawatts (MW).

Date Value Change, %
2006 497,420 34.41 %
2005 370,090 1.30 %
2004 365,330 14.55 %
2003 318,920 0.75 %
2002 316,540 0.00 %
2001 316,540 0.00 %
2000 316,540 39.27 %
1999 227,290 1.06 %
1998 224,910 0.00 %
1997 224,910 0.00 %
1996 224,910 1.61 %
1995 221,340