An error occured. Details Hide
You have unsaved pages. Restore Cancel

Uganda - Hydroelectricity Installed Capacity

374,850 (Kilowatt) in 2006

The maximum rated output of a hydroelectric generator. Source : US Energy Information Administration. .

Date Value Change, %
2006 374,850 1.61 %
2005 368,900 1.31 %
2004 364,140 14.61 %
2003 317,730 0.75 %
2002 315,350 0.00 %
2001 315,350 0.00 %
2000 315,350 39.47 %
1999 226,100 2.70 %
1998 220,150 0.00 %
1997 220,150 0.00 %
1996 220,150 1.65 %
1995 216,580