Sierra Leone - Total Electricity Installed Capacity

59,500 (Kilowatt) in 2006

The maximum rated output of a generator, prime mover, or other electric power production equipment under specific conditions designated by the manufacturer. Installed generator nameplate capacity is commonly expressed in megawatts (MW).

Date Value Change, %
2006 59,500 2.04 %
2005 58,310 0.00 %
2004 58,310 -2.00 %
2003 59,500 0.00 %
2002 59,500 19.05 %
2001 49,980 -23.64 %
2000 65,450 -3.51 %
1999 67,830 0.00 %
1998 67,830 -13.64 %
1997 78,540 0.00 %
1996 78,540 -19.51 %
1995 97,580