An error occured. Details Hide
You have unsaved pages. Restore Cancel

Sierra Leone - Hydroelectricity Installed Capacity

4,760 (Kilowatt) in 2006

The maximum rated output of a hydroelectric generator. Source : US Energy Information Administration. .

Date Value Change, %
2006 4,760 0.00 %
2005 4,760 0.00 %
2004 4,760 0.00 %
2003 4,760 0.00 %
2002 4,760 0.00 %
2001 4,760 0.00 %
2000 4,760 100.00 %
1999 2,380 0.00 %
1998 2,380 0.00 %
1997 2,380 0.00 %
1996 2,380 0.00 %
1995 2,380