An error occured. Details Hide
You have unsaved pages. Restore Cancel

Chad - Production of hydro electricity (GWh)

0 (GWh) in 2015

The amount of gross generation less the electrical energy consumed at the generating station(s) for station service or auxiliaries. Electricity required for pumping at pumped-storage plants is regarded as electricity for station service and is deducted from gross generation. Geothermal plant is a plant in which the prime mover is a steam turbine. The turbine is driven either by steam produced from hot water or by natural steam that derives its energy from heat found in rock.

Date Value Change, %
2015 0
2014 0
2013 0
2012 0
2011 0
2010 0
2009 0
2008 0
2007 0
2006 0
2005 0
2004 0