Angola - Total Electricity Installed Capacity

1,088,850 (Kilowatt) in 2006

The maximum rated output of a generator, prime mover, or other electric power production equipment under specific conditions designated by the manufacturer. Installed generator nameplate capacity is commonly expressed in megawatts (MW).

Date Value Change, %
2006 1,088,850 0.00 %
2005 1,088,850 29.79 %
2004 838,950 41.00 %
2003 595,000 0.00 %
2002 595,000 0.00 %
2001 595,000 0.00 %
2000 595,000 0.00 %
1999 595,000 8.70 %
1998 547,400 0.00 %
1997 547,400 -0.43 %
1996 549,780 0.00 %
1995 549,780