An error occured. Details Hide
You have unsaved pages. Restore Cancel

Angola - Production of electricity from solar, wind, tide, wave and other sources (GWh)

6 (GWh) in 2015

The amount of gross generation less the electrical energy consumed at the generating station(s) for station service or auxiliaries. Electricity required for pumping at pumped-storage plants is regarded as electricity for station service and is deducted from gross generation. Both conventional and combined hydroelectric plants. Conventional hydroelectric plant is a plant in which all of the power is produced from natural streamflow as regulated by available storage. Combined hydroelectric plant is a hydroelectric plant that uses both pumped water and natural streamflow for the production of power.

Date Value Change, %
2015 6 25.00 %
2014 5 7.03 %
2013 4 15.00 %
2012 4 15.00 %
2011 3
2010 0
2009 0
2008 0
2007 0
2006 0
2005 0
2004 0